Member Login
|
Create Account
|
RSS
Subscribe/Renew
HOME
MAGAZINE
Print Subscriptions
Current Edition
E-Edition
Online Exclusives
Submit a Story
Editorial Calendar
Problem Corner
Spanish Magazine
Archives
AERIAL MAPPING
Aerial Mapping 2013
Aerial Mapping 2012
Aerial Mapping 2011
Aerial Mapping 2010
Aerial Mapping Marketing Guide
RED PAGES
Submit or Update Listing
Online Directory
Red Pages Marketing Guide
E-NEWS
Pangaea
Pangaea Advertising
Field Notes
Field Notes Advertising
RESOURCES
Events
Industry News
Partners
PSM Forum
Resource Map
Store
Books
Miscellaneous
Apparel
ADVERTISING
Print
Newsletters
Web
eBlast
Our Circulation
CLASSIFIEDS
View Classified Ads
Place An Ad
View Resumes
Post Your Resume
Classifieds Marketing Guide
sub nav here
Professional Surveyor Magazine
August 2012 Volume 32 Issue 8
Articles
Editor's Desk:
The Future of NSPS
Feature:
Scanning London's Olympic Stadium
The Olympic Stadium is built from prefabricated steelwork components in a demanding workflow where the final design of successive components is adjusted to fit the verified deformation of each previously installed component. A team of experienced surveyors met this challenge, along with tight deadlines, to keep construction moving.
Feature:
Generating BIM Under Pressure
Laser scanning and automated feature extraction dramatically speed the process of 3D building information modeling for a $125 million hospital renovation in Ohio.
Feature:
Rising River Challenges
Hydrographic surveyors rely on a remotely operated survey vehicle mounted with a single-beam echo sounder and RTK GPS to survey water crossings for pipelines.
The Political Surveyor:
Waiting for Congress
Hardware Review:
Trimble VX Spatial Station
Web Waypoints:
Adding Data to Your Web Map
Business Leader:
Actionable Data Differentiates Today's Surveyors
Guest Editorial:
Surveying and Mapping Redefined
Intersect:
Is There Enough Turf for All Geospatial Professionals?
»
View other Issues in our Magazine Archive